Anchor Roofing Co. — Dana PointGet matched with vetted Dana Point roofers in minutes.Get on the list

Dana Point, CA

Roofing in East Dana Point

We match roofing contractors working the east side of Dana Point. Same three questions, same cap of three contractors, same absence of any cost to you.

Quotes for East Dana Point

Requests route on the ZIP you give us, not on a boundary line.

Free · No obligation

Join the waiting list

We are lining up licensed providers near you. Leave your details and we will email you when one can take this on.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Free, and no obligation to anyone.

Part ofDana Point
Population32,585
CountyOrange County
Dialling code(949)

Contractors quote after seeing the roof, not from a postcode, so where in Dana Point you are affects who turns up rather than what you are told.

Behind it: salt corroding fasteners and flashing years before the covering wears out. Airborne salt corrodes anything ferrous — nails, valley metal, vent collars, gutter hangers — years before the covering itself is worn out.

Most asked for around here: roof replacement

The price gap between the cheapest and the most expensive quote on the same roof is routinely forty per cent. That gap is not always quality, and it is never obvious from the paperwork.

More on roof replacement in Dana Point

Questions

Are the contractors licensed and insured?

Contractors have to give us their state licence number and proof of liability and workers compensation cover before they can receive requests. You should still ask to see current certificates yourself before work starts — a licence can lapse between checks.

What if the decking is rotten underneath?

Expect a few sheets on most older roofs. Get the per-sheet rate in the contract. Open-ended decking charges are where a fixed price stops being fixed.

How long does a re-roof take?

A straightforward asphalt roof on an average house is one to three days. Tile, slate and complex rooflines take longer, and weather stops work more often than anything else.

Ready for a real number?

Free, no obligation, and your details go to no company until you say yes.