Anchor Roofing Co. — Dana PointGet matched with vetted Dana Point roofers in minutes.Get on the list

Dana Point, CA

Flat roof work in Dana Point, CA

A pitched roof sheds water. A flat roof is a shallow tray that has to be watertight everywhere at once, which is a much harder thing to build.

Describe the flat roofing job

Three questions, then the address. Up to three Dana Point contractors who do this work.

Free · No obligation

Join the waiting list

We are lining up licensed providers near you. Leave your details and we will email you when one can take this on.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Free, and no obligation to anyone.

Before you let anybody on the roof

The things worth pinning down on a flat roofing job. A contractor who has not raised them has not looked properly.

  • How the flat section is flashed into adjoining walls and pitched roofs
  • Which membrane, and how the seams are joined
  • Drain, scupper and overflow provision
  • Whether a coating is being sold as a repair
  • Whether water ponds anywhere after rain

Single-ply membranes — TPO, PVC, EPDM — are heat-welded or taped at the seams. The seams and the terminations are the whole job.

Ponding water is the enemy. Anything still sitting there forty-eight hours after rain is a design problem, and tapered insulation is usually the answer.

Coatings can buy a sound roof several years. Coating a failed roof buys you a wet roof with a fresh top coat on it.

Locally

Behind it: salt corroding fasteners and flashing years before the covering wears out. Airborne salt corrodes anything ferrous — nails, valley metal, vent collars, gutter hangers — years before the covering itself is worn out.

About flat roofing here

What if the decking is rotten underneath?

Expect a few sheets on most older roofs. Get the per-sheet rate in the contract. Open-ended decking charges are where a fixed price stops being fixed.

How long does a re-roof take?

A straightforward asphalt roof on an average house is one to three days. Tile, slate and complex rooflines take longer, and weather stops work more often than anything else.

It is leaking right now. What do I do?

Move what you can out of the way, put a bucket under it, and if there is a bulge in the ceiling put a small hole at its lowest point to let the water out in one place rather than bringing the whole panel down. Then mark your request as an emergency — those go out first.

Do I have to hire anyone?

Not at all. Plenty of people use this to find out what a job costs and then do nothing for a year. That is a perfectly reasonable outcome.

Ready for a real number?

Free, no obligation, and your details go to no company until you say yes.