Dana Point, CA
Flat roof work in Dana Point, CA
A pitched roof sheds water. A flat roof is a shallow tray that has to be watertight everywhere at once, which is a much harder thing to build.
Or call (949) 849-0297Before you let anybody on the roof
The things worth pinning down on a flat roofing job. A contractor who has not raised them has not looked properly.
- How the flat section is flashed into adjoining walls and pitched roofs
- Which membrane, and how the seams are joined
- Drain, scupper and overflow provision
- Whether a coating is being sold as a repair
- Whether water ponds anywhere after rain
Describe the flat roofing job
Three questions, then the address. Up to three Dana Point contractors who do this work.
Your request is in.
We are matching it now against roofing contractors working in Dana Point and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
Single-ply membranes — TPO, PVC, EPDM — are heat-welded or taped at the seams. The seams and the terminations are the whole job.
Ponding water is the enemy. Anything still sitting there forty-eight hours after rain is a design problem, and tapered insulation is usually the answer.
Coatings can buy a sound roof several years. Coating a failed roof buys you a wet roof with a fresh top coat on it.
Locally
Behind it: salt corroding fasteners and flashing years before the covering wears out. Airborne salt corrodes anything ferrous — nails, valley metal, vent collars, gutter hangers — years before the covering itself is worn out.
About flat roofing here
What if the decking is rotten underneath?
Expect a few sheets on most older roofs. Get the per-sheet rate in the contract. Open-ended decking charges are where a fixed price stops being fixed.
How long does a re-roof take?
A straightforward asphalt roof on an average house is one to three days. Tile, slate and complex rooflines take longer, and weather stops work more often than anything else.
It is leaking right now. What do I do?
Move what you can out of the way, put a bucket under it, and if there is a bulge in the ceiling put a small hole at its lowest point to let the water out in one place rather than bringing the whole panel down. Then mark your request as an emergency — those go out first.
Do I have to hire anyone?
Not at all. Plenty of people use this to find out what a job costs and then do nothing for a year. That is a perfectly reasonable outcome.
Ready to see numbers?
No cost, no obligation, and never more than three contractors.
