Anchor Roofing Co. — Dana PointGet matched with vetted Dana Point roofers in minutes.(949) 849-0297Get my free quote

Guide

What to ask before you sign anything

Every contractor will answer these. The differences between the answers are where the useful information is.

Or call (949) 849-0297
Guide7 sections1 min readDana Point, CA

"What happens if the decking is rotten?"

The right answer is a specific price per sheet, written into the contract before work starts. A vague answer here is how a fixed price stops being fixed on day two.

"What underlayment, and how are the valleys done?"

A contractor who enjoys this question is usually the one whose roof lasts. A contractor who deflects it to brand names is quoting a different job.

Free · Fast · No obligation

Get it looked at

Three questions, and up to three Dana Point contractors. Free either way.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Free, fast, and no obligation to hire anyone.

"Who is actually doing the work?"

Ask how long this specific crew has worked together. Roofing companies keep their name and change their hands more often than most trades.

"Can I see a job you finished five years ago?"

Recent work shows tidiness. Older work shows competence. Ask for the older one.

"What is your licence number, and who holds it?"

The follow-up matters more than the answer: does the entity on the licence match the entity on the paperwork, and is it active today?

"What does your workmanship warranty cover, and for how long?"

Ask for it in writing, in the company name, with a term. Five to ten years is common; the term matters less than whether they will still be trading.

In short

Write the answers down. Two weeks later, when the quotes have blurred together, the notes are what you will actually decide on.

Related questions

Do I need a permit?

Yes, in nearly every jurisdiction a re-roof is permitted work. A contractor who suggests skipping it is telling you something useful about how they work.

What time of year is best to re-roof in Dana Point?

Practically, the long dry run from May to October. Crews are busiest right after the weather turns — November through March — so booking outside that stretch usually buys you a better date and a keener number.

How quickly will someone call?

Most requests are picked up the same day, often within an hour. Emergencies are prioritised. If you have not heard anything by the next morning, check voicemail — contractors usually call from a mobile.

Ready to see numbers?

No cost, no obligation, and never more than three contractors.

(949) 849-0297Call nowGet my free quote