Anchor Roofing Co. — Dana PointGet matched with vetted Dana Point roofers in minutes.(949) 849-0297Get my free quote

Dana Point, CA

Metal roofing in Dana Point

Metal has stopped being the agricultural option and started being the one people choose on purpose. The install quality still varies enormously.

Or call (949) 849-0297

Before you let anybody on the roof

The things worth pinning down on a metal roofing job. A contractor who has not raised them has not looked properly.

  • Panel gauge and the coating warranty
  • How valleys, ridges and penetrations are detailed
  • How the panels are allowed to expand and contract
  • Whether the crew installs metal regularly or occasionally
  • Standing seam or exposed fastener, and why

Describe the metal roofing job

Three questions, then the address. Up to three Dana Point contractors who do this work.

Free · Fast · No obligation

Describe the metal roofing job

Three questions, then the address. Up to three Dana Point contractors who do this work.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Free, fast, and no obligation to hire anyone.

A light-coloured metal roof reflects a serious amount of heat, which shows up on a summer power bill in hot climates.

Ask to see a standing-seam job they finished more than three years ago. The edges and the valleys will tell you everything.

Metal expands and contracts more than any other covering. Panels have to be allowed to move, and cheap installs pin them so they cannot.

Locally

Behind it: salt corroding fasteners and flashing years before the covering wears out. Airborne salt corrodes anything ferrous — nails, valley metal, vent collars, gutter hangers — years before the covering itself is worn out.

About metal roofing here

How many contractors will contact me?

No more than three. We picked that number because two quotes is not enough to spot an outlier and five is an ordeal.

Are the contractors licensed and insured?

Contractors have to give us their state licence number and proof of liability and workers compensation cover before they can receive requests. You should still ask to see current certificates yourself before work starts — a licence can lapse between checks.

What if the decking is rotten underneath?

Some of it usually is. The important thing is that the price per sheet is agreed in writing before the tear-off, so the conversation on day two is about quantity rather than rate.

How long does a re-roof take?

A straightforward asphalt roof on an average house is one to three days. Tile, slate and complex rooflines take longer, and weather stops work more often than anything else.

Ready to see numbers?

No cost, no obligation, and never more than three contractors.

(949) 849-0297Call nowGet my free quote